Saturday, 26 November 2011

FLAT SCREEN ON THE WALL

   
From this....  


  To this.....



In new houses is the walls are made from soft Thermalight blocks and there is a 20mm ish cavity that you need to pack out to stop the bracket collapsing into the plaster board.




So l marked out the wall bracket checking that there is no water pipes or electric cables running behind.


Using a hacksaw blade cut out the hole. Then measure the cavity and cut three pices of wood  to cover the area where the long screws go through. Making sure to drill through the center of the wood.


Use a old wire coat hanger to pull some nylon string down inside the cavity to the old electric socket. Tape this string to some 2.5 cable and pull up.Remove the single socket and replace with a round junction box.  
                                                                                                                                  


Connect the supply to the new length of cable. This will enable you to feed a pair of double socket's behind the TV.

Fill and sand the area.Work out the best place to where the sockets will go that will not stop the TV sitting flat.



Replace the plaster board cut out and fit the wall bracket.Check for level put the TV on the wall bracket to check fitting.



Fit the second part of the bracket to the TV with the screws provided. Make sure they are not too long and cause damage to the TV. Mark the wall where the shelving bracket will start. This will be just under the bottom of the TV drill and fit top bracket.

Pull all cables through back of the shelving unit positioning each cable set for each shelf.









Friday, 25 November 2011

THE DECK


A deck for her in doors.



From this....
To this...


















Remove excess soil for frame to sit level and dry. Try and keep the ground flat and level with a slight tilt to drain water.




















Lay frame work level along the front as the intention is to have the water to run toward the path. I always have 1" drop over 10 feet just to stop water gathering and freezing in winter.





To incorporate the Herringbone design I wish to use we need to construct a double support for middle joint. This will enable solid fixing on the ends of the deck-boards. (plastic sheet over my electrics)

















Plenty of noggins for a good sound job.





Start adding boards from the center this will allow you to easy set the pattern at 90 degrees using the 3-4-5 method. To get a accurate 90degree triangle use the following technique, one side of the triangle 3ft long the other at 4ft long an the last side will be 5ft. If you need to use this on a large base  any multiple of 3-4-5 will work. like 6-8-10 or 9-12-15.






The good thing about starting in the middle is the off cut from the big boards fit in the smaller ends thus getting less waste per board. Also with the herringbone pattern you only have to cut one end of the majority as they interlock with each other in the center.









Always re apply treatment when you cut the end off the board as the pressure treated part has been removed by cutting and drilling. I used End Coat to maintain the integrity of the pressure treatment.









Jobs a good un.